State Grant Program

The EMR Grant

EMR stands for Earthquake Multi-Unit Retrofit. It is a California grant program that helps owners of qualifying 5 to 10 unit buildings pay for a soft-story retrofit. Here is what it covers, what it does not, and how to prepare.

Who qualifies

A building generally needs to meet all of the following:

  • Wood-frame construction
  • Built before 1991
  • Five to ten residential units
  • A soft, weak, or open front condition, commonly tuck-under parking
  • Located in a participating city

If your building has fewer than five units or more than ten, EMR will not apply. That does not mean you are off the hook. Most participating cities have their own mandatory retrofit ordinances that apply regardless of unit count. See our soft-story retrofit page for what applies to buildings outside the EMR range.

What the grant covers

ItemCoverage
Construction costUp to 70 percent, capped at $4,260 per unit
Engineering and permit feesUp to 70 percent, capped at $7,000
Maximum per buildingRoughly $49,600 at ten units
Be realistic about the numbers

The per-unit cap usually binds well before the 70 percent cap does. On a five-unit building the maximum grant works out to about $28,300 total. If the retrofit costs $90,000, the grant covers roughly a third. If it costs $180,000, it covers closer to a sixth. Plan your budget around the cap, not around the 70 percent figure.

What kind of retrofit qualifies

EMR requires a full ground-floor retrofit. A line-only retrofit, meaning one that strengthens only the open front wall line, does not qualify.

The design must follow one of three recognized standards:

  • FEMA P-807. A performance-based method developed specifically for multi-unit wood-frame buildings with weak first stories.
  • IEBC Chapter A4. The International Existing Building Code appendix covering wood-frame residential buildings with soft, weak, or open front walls.
  • ASCE 41. The American Society of Civil Engineers standard for seismic evaluation and retrofit of existing buildings.

These are not interchangeable in terms of cost. The same building analyzed under different standards can require meaningfully different amounts of steel. When you compare contractor bids, ask which standard each engineer used. A lower bid sometimes reflects a different design basis rather than a better price.

Key dates

MilestoneDate
EMR registration opensAugust 19, 2026
San Jose ordinance screening deadlineOctober 1, 2027
San Jose construction deadlines2029 through 2033, by building group
Do not start work early

Grant programs generally will not reimburse work that began before registration and approval. Confirm the current rule in the program guidelines before signing a construction contract or breaking ground. Getting this wrong can cost you the entire grant.

How we help

  • Assessing whether your building is likely to qualify before you spend anything
  • Coordinating with a structural engineer for the required design
  • Permit submittal and plan check coordination
  • Construction, inspection, and final sign-off
  • Documentation the program requires, including photos and inspection records

We bid these in two phases. A firm price for engineering first, then a firm construction price once the design is stamped and the actual scope is known.

Program details are set by the state and can change. Verify current requirements, amounts, and deadlines with the program administrator before making decisions. We keep this page current but the official program rules govern.